Worked example

CRM8: Thames Water's sewage and dividend penalties through Hopkin's four types of control

MANCOSA's November 2025 CRM8 summative Question 1 answered: Thames Water's risk treatment failures, the missed integrated controls, and who should fix them.

Question 1 of MANCOSA’s CRM8 Corporate Risk Management final summative assessment of 21 November 2025, worth 20 marks, is the first of two compulsory Section A questions on a news report about the penalties Ofwat imposed on Thames Water in May 2025. It asks for Hopkin’s framework of risk control applied to a real company’s failure, across three risk domains, with recommendations. The question is described in our own words below; the answers are TheronGroup’s.

The question

The extract reports that Ofwat, the water regulator for England and Wales, penalised Thames Water about £123 million: a record penalty of about £104 million for failing to operate and maintain its sewage treatment works and wastewater networks properly, and £18,2 million for paying dividends in breach of the rules, the first penalty of that kind in the industry. The penalties were to be borne by the company and its investors, not its customers. Ofwat found a significant breach of the company’s legal obligations, an unacceptable impact on the environment and customers, and no acceptable redress package offered by the company. The extract adds that Thames Water’s own data showed raw sewage discharges into rivers rising by 50% in 2024.

The financial background is set out too. Thames Water serves 16 million customers in London and the Thames Valley. Its finances had been drained by years of dividends to earlier shareholders and by fines; its credit rating had fallen below investment grade, placing it under a “cash lock-up” that requires permission before any further cash goes to shareholders; it had secured an emergency £3 billion loan in February 2025 and was negotiating with a private equity bidder; and its chair had told Parliament that the company came close to running out of money the year before. Creditors had pressed for large bonuses for senior executives out of that loan, a claim later withdrawn along with the retention payments. The environment secretary called the penalties the toughest crackdown on water companies in history.

Required. Using Hopkin’s framework of risk control, assess Thames Water’s risk treatment shortcomings and the missed opportunities for integrated control systems, and recommend improvements. Frame the analysis in the principles of corporate risk governance, and refer to the financial, environmental and reputational risk domains. (20 marks)

The figures

Item Working Amount
Wastewater penalty, as set by Ofwat £104,5 million
Dividend penalty £18,2 million
Total penalties £104,5m + £18,2m £122,7 million
Dividends found in breach, per Ofwat’s decision £37,5m (October 2023) + £131,3m (March 2024) £168,8 million
Dividend penalty as a share of the dividends £18,2m ÷ £168,8m 10,8%

The extract’s £123 million and £104 million are the same figures rounded: £104 million plus £18,2 million is £122,2 million, and it is the unrounded £104,5 million that gives £122,7 million. The last line is the more telling figure. A penalty of about a tenth of the dividends it concerns is unlikely, on its own, to be what stops a board paying them.

Hopkin’s framework of control

Hopkin treats risk treatment as risk control: selecting and implementing actions that reduce the likelihood and the impact of a risk. His four types of control come in an order of preference:

  1. Preventive controls, introduced first wherever reasonably practicable, stop the event happening.
  2. Corrective controls, where prevention is not possible, reduce the likelihood and impact of the adverse event once the risk is live.
  3. Directive controls, considered once prevention and correction have gone as far as is cost-effective, direct the actions of the people managing the risk: policies, rules, licence conditions.
  4. Detective controls, added to the other three, identify that the event has happened.

Control is chosen on cost: Hopkin’s cost-of-control analysis shows an optimum level of control at which the cost of controls plus the remaining potential loss is lowest, beyond which more spending buys little reduction in loss.

The risk treatment shortcomings

Control type What it requires What Thames Water did Domain struck
Preventive Stop the discharge happening Treatment works and networks were not operated and maintained adequately, so sewage reached rivers outside the exceptional conditions permits allow Environmental, then financial
Corrective Limit the harm once the risk is live Discharges rose 50% in 2024, and the company offered no acceptable redress package, so harm was neither contained nor repaired Environmental and reputational
Directive Direct the conduct of those managing the risk Dividends were paid in breach of the rules linking them to performance; bonuses were proposed out of an emergency loan Financial and reputational
Detective Identify that the event has happened The company’s own discharge data recorded the failures, and that record is what the enforcement rested on Environmental

Preventive control is where the failure starts. Ofwat’s finding was a failure to operate and manage treatment works and networks effectively. That is a preventive failure, because a preventive control acts before the event to stop it, and treatment capacity that is degraded or absent cannot act. The causal chain runs from a cause (capital spending on the network not keeping pace with what the assets needed, at a company whose cash was going to shareholders and lenders), to the risk event (untreated sewage discharged into rivers), to the consequences (environmental damage, the £104,5 million penalty and the loss of the regulator’s confidence). Controls are aimed at the event, the discharge, not at its consequence, the fine.

Corrective control failed twice. Discharges went up, not down, which is containment failing; and the redress package Ofwat would have accepted, which is the corrective response to harm already done, was never offered. A corrective control that is not used leaves the regulator to impose the correction instead, at the company’s expense.

Directive control is the dividend breach. A licence condition tying dividends to performance is a directive control in its plainest form: it exists to direct the people deciding a payment, not to stop a physical event. The board paid £168,8 million in breach of it. The proposed bonuses out of a £3 billion emergency loan are the same failure: a remuneration decision that ignored the company’s position.

Detective control was the one that worked, and that is the finding. Monitoring recorded the discharges, and the 50% rise is known because the company’s own data showed it. Detection alone reduces neither the likelihood nor the impact of the event it records. A portfolio strongest in Hopkin’s last category and weakest in his first is the order of preference inverted.

Where the marks are lost. Describing the four types of control in general and then summarising the case. The marks are in placing each failure in the right category and saying why it belongs there. The dividend breach is directive, not preventive, because a licence condition directs behaviour; the monitoring is detective, and its success is part of the criticism, not a defence.

The missed opportunities for integrated control

The financing decision was never tested against the operating one. In an integrated system a proposed dividend would be put beside the capital programme it displaces and the environmental performance the licence requires, and would fail that test. At Thames Water the two were treated as separate matters for separate functions. ISO 31000:2018 makes integration the first of its principles: risk management is part of all organisational activities, including decisions about distributing cash, not a separate exercise.

Detection was never connected to correction. Discharge data shows which assets spill, how often and in what conditions, which is exactly the input a prioritised maintenance programme needs. Where detection feeds correction, the two controls reinforce each other; where detection only reports, the company builds the evidence against itself.

Remuneration was not tied to risk. Executive pay proposed out of emergency funding, while the regulator was finding environmental breaches, shows no link between reward and the risk outcomes the board was meant to be governing.

The three risk domains

Financial. £122,7 million of penalties matters less than what the penalties sit on: a credit rating below investment grade, a cash lock-up, an emergency £3 billion loan, a near-collapse of liquidity, and the prospect of renationalisation if new investors cannot be found. The penalties are a symptom; the financing structure is the threat to solvency.

Environmental. Untreated sewage in rivers serving 16 million customers is the event at the centre of the case. Hopkin’s FIRM risk scorecard (financial, infrastructure, reputational and marketplace) has no environmental heading, so in that scheme the harm is an infrastructure risk in its cause and a reputational risk in its consequence. The question names an environmental domain, and the answer should use it.

Reputational. A monopoly water company cannot lose its customers, but it can lose the consent of its regulator and of government, on which its licence and its ownership depend. The minister’s statement that profiting from failure was over is that consent being withdrawn in public.

Recommendations, each with an owner

Recommendation Owner What it leaves behind
Reorder the control portfolio: commit a stated share of capital spending to preventive work on the assets the discharge data identifies as the worst, and report that share publicly The board, because it is a capital allocation and strategy decision Preventive works take years, so environmental exposure stays high while they are built
Test every proposed distribution, in one report, against the capital programme it defers and the licence conditions it engages, before it is approved The audit and risk committee A committee can test only what management brings to it
Turn discharge data into maintenance triggers, so an asset that spills beyond a set threshold enters the priority programme automatically The executive responsible for operations A trigger based on how often an asset spills can miss assets that fail rarely but badly
Link executive remuneration to environmental performance and compliance, and bar awards funded from emergency borrowing The remuneration committee Pay design shapes behaviour only over time
Offer redress for environmental harm promptly, so correction is the company’s choice and not the regulator’s sanction The board, through the executive Redress costs money the company is short of, which is why it has to be decided at board level

These sit within corporate risk governance: the board sets the direction and the appetite, its committees provide oversight, management owns and operates the controls, and internal audit gives independent assurance that they work.

Thames Water did not lack controls; it held them in the wrong order. Its strongest control was the one Hopkin places last and its weakest the one he places first, and the dividend decision that displaced preventive spending was never tested by any integrated system. The recommendations change the direction of travel; they do not change the current position, which the company’s finances will constrain for years.

Where the marks are lost. Recommendations without owners, or owners without the reason. “Improve maintenance” earns little; a named control, the body responsible for it and the risk it leaves behind earn the recommendation marks, and they show the corporate risk governance framing the question asks for.

Studying CRM8

CRM8 is built on Hopkin’s Fundamentals of Risk Management (6th edition, 2022), the module’s prescribed text. The CRM8 course has assessment model answers across multiple paper sets, at R1 450 for the complete module.

Get in touch

Tell us your module

Send the module code and your sitting. We reply with exactly what exists for it today, a free extract from that module, and what it costs.

Students

Name your module code and sitting. You get a free extract from your own module — not a generic brochure — before any payment.

Send an enquiry

Free extract

A full worked example and a note extract from the module you are sitting, sent the same week you ask.